A
ADWORKSSOLAR PROPOSAL CALCULATOR · COMMERCIAL ONLINE
● ONLINE COMMERCIAL
ADWORKS™ COMMERCIAL ONLINE

Sign in to continue

The Solar Proposal Calculator is available only to signed-in customers with an active ADWORKS subscription.

PROFESSIONAL SOLAR ASSESSMENT · CONTINUOUS IMPROVEMENT RELEASE

Assess faster. Recommend smarter.
Present professionally.

Global CurrencyPHP (₱)All package pricing is editable in Settings
STEP 01

Client & Energy Assessment

SYSTEM DESIGN OPTIONS

Choose preferred equipment design

Automatic preliminary recommendationCalculations are intended for client demonstration and initial planning.
STEP 02

Recommended Solar Packages

HYBRID
EST. MONTHLY USEkWh
EST. DAILY USEkWh/day
TARGET SOLAR ARRAYkWp
EST. MONTHLY SAVINGSPHP
BUDGET / ESSENTIAL
LOWER INITIAL INVESTMENT

₱0
    FUTURE-READY
    EXPANSION OPTION

    ₱0
      Why this setup?

      Enter the client information and select Compute & Recommend.

      STEP 03

      Client Proposal Preview

      A
      ADWORKSSOLAR ENERGY SOLUTIONS
      PRELIMINARY SOLAR PROPOSALADW-SOLAR-0001
      PREPARED FORProspective ClientProject Location
      DATEValid for 15 days
      RECOMMENDED CONFIGURATIONHybrid Solar
      SELECTED ALL-IN PACKAGE

      ADWORKS Solar Package

      Complete supply, installation, testing and commissioning.

      ALL-IN PACKAGE PRICE₱0.00Philippine Peso

      Package Inclusions

      EST. SOLAR PRODUCTION
      EST. SOLAR OFFSET
      BACKUP LOAD BASIS
      EST. MONTHLY SAVINGS₱0
      EST. ANNUAL SAVINGS₱0
      SIMPLE PAYBACK
      20-YEAR SAVINGS₱0

      Proposal Message

      Scope of Work

      Supply and delivery, mounting, electrical installation, protection devices, testing, commissioning, basic documentation and client handover.

      Payment Terms

      50% down payment · 40% upon delivery · 10% upon turnover

      Warranty

      Panels: manufacturer performance warranty · Inverter and battery: manufacturer warranty · Workmanship: 6 months.

      Important Note

      Preliminary recommendation only. Final design and price are subject to site assessment, roof inspection, load validation and engineering verification. Final PV string quantity, modules per string, MPPT allocation and DC combiner/string-protection configuration must be verified against the selected inverter and module datasheets before construction.

      ADWORKS Solar Energy SolutionsPage 1 of 4
      A
      ADWORKSSOLAR ENERGY SOLUTIONS
      PROPOSED SYSTEM DESIGNADW-SOLAR-0001
      PAGE 02 · INSTALLATION VISUALIZATION

      How the Solar System Will Be Installed

      This preliminary visualization helps the property owner understand the proposed rooftop array, equipment placement and power flow before final site engineering.

      Proposed SetupHybrid solar system
      Backup DesignSelected essential loads
      Final VerificationSite survey, roof inspection, equipment datasheets and applicable electrical code.

      Conceptual client-presentation diagram only. Final PV string quantity, modules per string, MPPT allocation, DC combiner/string-protection configuration, conductor sizes, protection ratings, grounding, equipment location and cable routes must be verified against actual equipment datasheets and site conditions before construction.

      ADWORKSPage 2 of 4
      A
      ADWORKSSOLAR ENERGY SOLUTIONS
      PRELIMINARY WIRING & POWER FLOWADW-SOLAR-0001
      PAGE 03 · BASIC WIRING DIAGRAM

      Automatic Basic Wiring & Power Flow

      The selected package below is shown as a readable preliminary power-flow diagram. Multi-inverter, battery-bank, combiner and source blocks automatically follow the selected recommendation.

      Selected SystemSelected solar configuration
      Protection & CombiningPV string OCPD, DC isolator/SPD, AC branch protection and combiners as applicable.
      Engineering NoteFinal ratings, conductor sizes, MPPT/string allocation, grounding and utility interface require site and datasheet verification.

      Preliminary proposal diagram only. Final construction details must be verified by qualified personnel against actual equipment datasheets, site conditions and applicable electrical requirements.

      ADWORKSPage 3 of 4
      A
      ADWORKSSOLAR ENERGY SOLUTIONS
      COMPLETE PACKAGE SCOPEADW-SOLAR-0001
      PAGE 04 · MATERIALS & ACCEPTANCE

      Complete Preliminary Package Materials

      Whole-package presentation for the selected solar configuration. Quantities remain editable and subject to final site measurement.

      ITEM / MATERIALQTYUNITDESCRIPTION

      About ADWORKS

      Professional solar energy assessment, proposal and project support.

      Why Choose Us

      Practical recommendations, transparent packages, safety-conscious planning and dependable client support.

      Prepared by
      Dennis T. Pineda
      Client Acceptance
      ____________________________Signature over printed name / Date
      ADWORKS Solar Energy SolutionsPage 4 of 4
      STEP 04

      Automatic Basic Wiring Diagram

      PRELIMINARY

      For client presentation and initial planning only. Final protection ratings, wire sizes, PV string configuration and installation details require site assessment and engineering verification.

      A
      ADWORKSSOLAR ENERGY SOLUTIONS
      PREMIUM LARGE / MEGA PROJECT
      PREMIUM ADVANCED DESIGN

      Three Design Recommendations

      Commercial / Industrial roof-feasibility alternatives based on the current calculated requirement.

      ENGINEERING REVIEW REQUIREDFinal array loading, equipment compatibility, electrical protection and construction drawings require site and engineering verification.
      ADWORKSPremium Large / Mega Project · Page 5
      A
      ADWORKSSOLAR ENERGY SOLUTIONS
      ROOF / ARRAY VISUAL CONCEPT
      VISUAL DESIGN BASIS

      Roof, Secondary Structure & Ground-Mount Options

      Visual is conceptual and scales automatically from the selected option. Actual roof dimensions, setbacks, access paths, shading, attachment spacing and structural capacity must be confirmed on site.

      ADWORKSPremium Large / Mega Project · Page 6
      A
      ADWORKSSOLAR ENERGY SOLUTIONS
      SLD / STRING CONNECTION
      TECHNICAL CONNECTION CONCEPT

      Series / Parallel PV Strings & Multi-Inverter Architecture

      Final panels-per-string, MPPT allocation, Voc/Vmp/current limits, conductor size, OCPD, SPD and disconnect ratings must follow the actual module and inverter datasheets plus applicable electrical requirements.

      ADWORKSPremium Large / Mega Project · Page 7
      A
      ADWORKSSOLAR ENERGY SOLUTIONS
      LARGE / MEGA PROJECT STRATEGY
      SCALABLE kW-to-MW PLANNING

      Distributed Array & Expansion Strategy

      DEFAULT ENGINEERING RECOMMENDATIONIf the full calculated array exceeds practical roof capacity, compare Full Requirement, Roof-Optimized and Roof-Constrained designs, then confirm the final configuration after structural review and site inspection.
      ADWORKSPremium Large / Mega Project · Page 8
      OTHER SERVICE QUOTATIONS

      Solar Installation Service Quotation

      INSTALLATION ONLY
      Hybrid installation computationChoose PV Wp, inverter kW, or manual fixed charging basis, then add equipment labor, electrical works, materials and complexity adjustments.
      A
      ADWORKSSOLAR ENERGY SOLUTIONS
      INSTALLATION SERVICE QUOTATIONADW-SERVICE-0001
      PREPARED FORProspective ClientProject Location
      DATEValid for 15 days
      PROJECT10kW Solar InstallationInstallation service only
      PROPOSED SERVICE

      Solar PV Installation & Electrical Works

      Professional installation, protection, testing and commissioning based on the preliminary project information.

      QUOTATION TOTAL₱0Philippine Peso
      DESCRIPTIONAMOUNT
      GRAND TOTAL₱0

      Proposal Message

      Scope of Work

      Mobilization, roof and electrical inspection, mounting, inverter and battery installation, AC/DC electrical works, protection devices, testing, commissioning and turnover.

      Payment Terms

      Important Note

      Equipment supply is excluded unless stated. Final quantities and price remain subject to site inspection, cable measurement, roof condition and approved final design.

      Warranty

      Prepared by
      Dennis T. Pineda
      Client Conformity
      ____________________________Signature over printed name / Date
      ADWORKS Solar Energy SolutionsInstallation Service Quotation
      PREMIUM · GENERAL SERVICES

      General Services Proposal & Quotation

      For Automation, Electrical, CCTV, Electronics, Networking / IT, Repair, Maintenance, Installation and other custom services.

      PREMIUM ONLY

      Editable Items / Materials / Labor

      TYPEDESCRIPTIONQTYUNITUNIT PRICE
      A
      ADWORKSSOLAR ENERGY SOLUTIONS
      GENERAL SERVICES PROPOSAL & QUOTATIONADW-GEN-0001
      PREPARED FORProspective ClientClient Address
      DATEValid for 15 days
      SERVICE CATEGORYGeneral ServiceProject
      PROPOSED SERVICE

      General Services Proposal & Quotation

      QUOTATION TOTAL₱0.00Current Currency
      DESCRIPTIONQTYUNIT PRICEAMOUNT
      GRAND TOTAL₱0.00

      Schedule / Lead Time

      Terms & Conditions

      Notes / Exclusions

      Professional Commitment

      We aim to provide clear scope, professional coordination, quality workmanship and transparent project documentation. Final execution remains subject to approved scope and actual site requirements.

      Closing Note

      We appreciate your consideration and look forward to the opportunity to provide a professional, reliable and well-coordinated solution for your project.

      Prepared by
      ADWORKS
      Client Acceptance
      ____________________________Signature over printed name / Date
      ADWORKSGeneral Services Proposal & Quotation
      06 · PREMIUM FINANCIALS

      Project Financials

      Internal profitability and customer-safe financial analysis in one focused workspace.

      FINANCIAL ANALYSIS
      01 · INTERNAL

      Project Profit & Margin Analysis

      PREMIUM
      NET SELLING PRICE
      TOTAL PROJECT COST
      GROSS PROFIT
      MARGIN / MARKUP
      Enter internal costs to evaluate this project.
      02 · CUSTOMER-SAFE ANALYSIS

      Advanced Financial Analysis

      PREMIUM
      YEAR 1 SAVINGS
      SIMPLE PAYBACK
      LIFETIME NET BENEFIT
      LIFETIME ROI
      Run analysis after computing a solar recommendation.
      07 · PREMIUM TOOLS

      Proposal & Business Tools

      Presentation templates, project reports and proposal delivery.

      CUSTOMER + BUSINESS TOOLS
      03 · CUSTOMER PROPOSAL

      Advanced Proposal Workflow

      PREMIUM

      Prepare up to 3 customer choices. Sync the current recommendation, then edit names, system descriptions and prices as needed.

      04 · PREMIUM COMMERCIAL / INDUSTRIAL

      Large & Mega Project Solar Design

      PREMIUM

      Turn high-load Commercial and Industrial calculations into three practical design paths when roof space, panel quantity or structural loading is constrained. Select any option to make it the active proposal basis.

      Large/mega-project recommendations are preliminary planning alternatives. Final structural loading, module selection, string sizing, protection, inverter compatibility and code compliance require site inspection and engineering review.

      05 · PRESENTATION

      Premium Proposal Templates

      PREMIUM

      06 · INTERNAL REPORT

      Advanced Project Report

      PREMIUM

      Generates a contractor-side project summary using the current assessment, profitability and financial analysis.

      07 · PROPOSAL DELIVERY

      Email Proposal Workflow

      PREMIUM

      Secure workflow: no Gmail/SMTP password is stored in the browser. Attach the proposal PDF from Print / Save PDF before sending.

      A
      ADWORKSSOLAR ENERGY SOLUTIONS
      PREMIUM PROJECT BUSINESS REPORTINTERNAL
      INTERNAL · CONFIDENTIAL

      Project Profitability & Financial Summary

      This report is intended for contractor/business use and is not automatically included in the customer proposal.

      ADWORKSPremium Internal Report